To be able to qualify as a Basis team member, your commitment is the key. Below is the minimum requirement:

  • $300 registration fee paid by Paypal or e-transfer: fandezhi@efglobe.com. This will cover the cost of our initial hardware procurement
  • 10 hours a week minimum on the project, including research on latest SAP products, document and practice on our lastest VMWare ESXi platform
  • Regular meet up.

Project "Shark" Servers will be powered up this Saturday September 24th, 2016

Note: considering limited hardware capacity, registration will be closed on October 1, 2016

Benefit for team members
~ Powerful server hardware including latest Intel Xeon E5-2670 V3 CPU, 256GB~512GB ram and fastest SSD RAID
~ Shared SAP training document, certification material and project proposal
~ Networking on SAP job opportunities and potential projects RFP
~ Non-profit supporting on all your future projects

Member list (this list will be updated regularly)

  1. Adam Li
  2. Haifeng
  3. Ryan H
  4. Wei Wu
  5. Eds
  6. Steven Zhang
  7. Bruce Cheng
  8. Robin Gu
  9. Travis Zong
  10. Meiping
  11. Linghong
  12. Ning Cao
  13. Laopi
  14. Bigben
  15. Angela Xue
  16. James Jia
To be able to qualify as a Basis team member, your commitment is the key. Below is the minimum requirement: - $300 registration fee paid by Paypal or e-transfer: **fandezhi@efglobe.com**. This will cover the cost of our initial hardware procurement - 10 hours a week minimum on the project, including research on latest SAP products, document and practice on our lastest VMWare ESXi platform - Regular meet up. Project "Shark" Servers will be powered up this Saturday September 24th, 2016 **Note: considering limited hardware capacity, registration will be closed on October 1, 2016** ================================================================================================= **Benefit for team members** ~ Powerful server hardware including latest Intel Xeon E5-2670 V3 CPU, 256GB~512GB ram and fastest SSD RAID ~ Shared SAP training document, certification material and project proposal ~ Networking on SAP job opportunities and potential projects RFP ~ Non-profit supporting on all your future projects **Member list (this list will be updated regularly)** 1. Adam Li 1. Haifeng 1. Ryan H 1. Wei Wu 1. Eds 1. Steven Zhang 1. Bruce Cheng 1. Robin Gu 1. Travis Zong 1. Meiping 1. Linghong 1. Ning Cao 1. Laopi 1. Bigben 1. Angela Xue 1. James Jia

Project 'Clam' founder

edited Oct 3 '16 at 12:10 am

First stage of project: every member will have full access to our ESXi and various OS guest systems as root, including all sort of Windows servers, Linux, file servers, installation media, etc

  1. Provision Vmware ESXi guest systems for each member
  2. Install SAP ECC6 EHP7 IDES (on Oracle or SQL Server)
  3. Upgrade to ECC6 EHP8 (on Oracle or SQL Server)
  4. Migrate to EHP8 Suite on HANA
  5. Upgrade to S/4HANA FINANCE 1605
First stage of project: every member will have full access to our ESXi and various OS guest systems as root, including all sort of Windows servers, Linux, file servers, installation media, etc 0. Provision Vmware ESXi guest systems for each member 1. Install SAP ECC6 EHP7 IDES (on Oracle or SQL Server) 2. Upgrade to ECC6 EHP8 (on Oracle or SQL Server) 3. Migrate to EHP8 Suite on HANA 4. Upgrade to S/4HANA FINANCE 1605

Project 'Clam' founder

edited Sep 23 '16 at 11:53 am

Stage 2: participate in our SAP consulting service to local / global customers. Project members will be able to engage into current projects, or join our marketing team for future projects.

Project cost provisioning:

  • for a typical SAP migration project (non HANA), the customers will be budgeting $500k to $1 million. for HANA related migration, the cost will be at least doubled
  • for a typical SAP upgrade project, since it's related to a lot of functional configuration, normally it will last for at least 6 months and cost 2 million $ as a start.
  • for brand new S/4 project, the budget will be start with 1 million, to 50 million
Stage 2: participate in our SAP consulting service to local / global customers. Project members will be able to engage into current projects, or join our marketing team for future projects. Project cost provisioning: - for a typical SAP migration project (non HANA), the customers will be budgeting $500k to $1 million. for HANA related migration, the cost will be at least doubled - for a typical SAP upgrade project, since it's related to a lot of functional configuration, normally it will last for at least 6 months and cost 2 million $ as a start. - for brand new S/4 project, the budget will be start with 1 million, to 50 million

Project 'Clam' founder

edited Sep 22 '16 at 8:00 pm
791
views
2
replies
0
followers
live preview
enter atleast 10 characters
WARNING: You mentioned %MENTIONS%, but they cannot see this message and will not be notified
Saving...
Saved
All posts under this topic will be deleted ?
Pending draft ... Click to resume editing
Discard draft