Project "Shark"
Project "Shark" - to be determined
57
Topics
242
Posts
0
Followers
Normally newer SAP products will require MOPZ or the recent Maintenance Planner on Solution Manager to collect the patch. The reason, obviously, is for the convenience of calculating the stack, also for integrity of components patch levels


However, we can always manually download some patches from SAP service market. This is mostly used in a company when they don't want to impact the busine
582231274f042.jpg
3replies
404views
recent by Adam Li  ·  Nov 8 '16 at 9:27 pm
Export, run sapinst from SWPM on Win2012


During Export steps, it'll ask for target Database type, we'll choose HANA


Export files structure. It's different than Installation package.


Import, run sapinst from SWPM on Linux


OS/DB migration will require a key. As per SAP note 1134948 - ABAP Migration Key for special installation numbers
Installation number: INITIAL

Migration K
5820cd7466f2b.jpg
3replies
701views
recent by Adam Li  ·  Nov 8 '16 at 5:20 pm
In this article it will provide a step-by-step guild on how to connect to an external HANA system from HANA studio. So that Project Shark HANADB on BW will connect to Project Clam HANA_SHR. Actually it has the ability to connect to all sort of data sources such as Oracle, SQL Server, Hadoop big data, etc as long as the client drivers are in place with the HANA DB server.



580a710068f39.jpg
4replies
333views
recent by meiping  ·  Oct 31 '16 at 1:49 am
Load more
All posts under this topic will be deleted ?
Pending draft ... Click to resume editing
Discard draft